PROTOTYPE DEMO · brand, domain, phone and prices are placeholders — replace before going live

Compatible for Cummins 6L / 6ISDe - Forged Steel Crankshaft

Forged steel crankshaft for 6L and 6ISDe engines, ground to standard or oversize and dynamically balanced. Magnetic-particle tested before dispatch; journal sizes are recorded on the inspection sheet so your rebuilder can match bearings before the crate arrives.

$740 – $1,090 per piece · FOB Guangzhou
MOQ
1
Lead time
15–25 days
Warranty
6 months
Weight
90 kg
Indicative FOB Guangzhou price. Final price depends on quantity, quality grade and shipping terms.

Quality: Brand new aftermarket · OEM surplus on request

Fits these machines

BrandModelNote
Cummins6LVerify serial range
Cummins6ISDeVerify serial range
Cummins6ISBeVerify serial range
CumminsQSL9Verify serial range

Specifications

MaterialForged steel, induction hardened
GrindingStandard or oversize on request
TestMagnetic particle + balance
ReportJournal sizes recorded
Weight90 kg
Packing110 × 40 × 40 cm, wooden box
Warranty6 months

Shipping to your market

DestinationModeTransitIndicative
Tashkent, UZ / ТашкентRail + truck15–25 daysfrom $2.9/kg
Almaty, KZ / АлматыRail + truck12–22 daysfrom $2.6/kg
Lagos, NG / ЛагосSea LCL32–45 daysfrom $95/CBM
Nairobi, KE / НайробиSea LCL28–38 daysfrom $110/CBM
Rotterdam, NL / РоттердамSea LCL30–40 daysfrom $85/CBM

Freight is volatile — final cost confirmed at booking. We can ship consolidated with other parts to cut cost.

FAQ

How do I confirm this fits my machine?

Send the machine model, serial number and a photo of the identification plate. We check the OEM cross-reference and confirm before you pay.

What is included in the warranty?

6 months against manufacturing defects. Consumables, damage from contaminated oil and labour are excluded. We ship replacement parts, not cash refunds.

How do I pay?

30–50% deposit by T/T, balance before dispatch. For first orders we accept 100% advance or a documentary collection through your bank.

How is it shipped?

LCL or full container from Guangzhou. Rail/truck to Central Asia in 15–25 days, sea to Africa in 28–45 days. We quote FOB, CIF or DDP.

Get a price for this part

Send the machine model and quantity. You get a quote with shipping cost to your city within 24 hours.

This prototype form composes the message locally — connect your CRM or a form service before going live.

Related parts