Photo on request - we photograph this unit (or the exact equivalent) before shipment.
Hydraulic Shear / Pulverizer 20-30t class
Hydraulic Shear / Pulverizer 20-30t class. Sourced as new aftermarket replacement. Test run and jaw check before dispatch. Sourced from our Guangzhou supply base as a high-value line; photos and the test report of the actual unit are sent before you pay.
- MOQ
- 1
- Lead time
- 25-40 days
- Warranty
- 6 months
- Weight
- 1800 kg
Quality: New, aftermarket replacement
Fits these machines
| Brand | Model | Note |
|---|---|---|
| Universal | 20-30t class | Verify serial range |
Specifications
| Type | Hydraulic Shear / Pulverizer |
|---|---|
| Fits | 20-30t class |
| Condition | New, aftermarket replacement |
| Reference number | OEM number confirmed per order; internal ref. AT-UNI-2030TCLA |
| Testing | Test run and jaw check |
| Target markets | Africa (Nigeria / Kenya / Ghana / Tanzania / South Africa) |
| Packing | Wooden crate, sea freight (LCL/FCL) consolidated |
| Weight | 1800 kg |
| Packing | Wooden crate, sea freight (LCL/FCL) consolidated |
| Warranty | 6 months |
Shipping to your market
| Destination | Mode | Transit | Indicative |
|---|---|---|---|
| Tashkent, UZ / Ташкент | Rail + truck | 15–25 days | from $2.9/kg |
| Almaty, KZ / Алматы | Rail + truck | 12–22 days | from $2.6/kg |
| Lagos, NG / Лагос | Sea LCL | 32–45 days | from $95/CBM |
| Nairobi, KE / Найроби | Sea LCL | 28–38 days | from $110/CBM |
| Rotterdam, NL / Роттердам | Sea LCL | 30–40 days | from $85/CBM |
Freight is volatile — final cost confirmed at booking. We can ship consolidated with other parts to cut cost.
FAQ
How do I confirm this fits my machine?
Send the machine model, serial number and a photo of the identification plate. We check the OEM cross-reference and confirm before you pay.
What is included in the warranty?
6 months against manufacturing defects. Consumables, damage from contaminated oil and labour are excluded. We ship replacement parts, not cash refunds.
How do I pay?
30–50% deposit by T/T, balance before dispatch. For first orders we accept 100% advance or a documentary collection through your bank.
How is it shipped?
LCL or full container from Guangzhou. Rail/truck to Central Asia in 15–25 days, sea to Africa in 28–45 days. We quote FOB, CIF or DDP.
Related parts
Attachments & Couplers