Universal Excavator Track Shoes

Track shoes (track pads) for Confirm by pitch and width. Cast or forged 3-bar / single-bar plates, holes match the original chain pitch - confirm the pitch, width and bolt pattern before ordering. Confirm the machine serial or the old part number before ordering - we check fitment against the OEM cross-reference.

$85 – $140 per unit · FOB Guangzhou
MOQ
10
Lead time
15-25 days
Warranty
6 months
Weight
900 kg
Indicative FOB Guangzhou price. Final price depends on quantity, quality grade and shipping terms.

Quality: New, aftermarket quality grade

Fits these machines

BrandModelNote
UniversalConfirm by pitch and widthVerify serial range

Specifications

TypeTrack shoes / track pads
ConditionNew (aftermarket replacement)
Fitment checkSend pitch, shoe width and bolt pattern
PackingExport pallet with strapping
Part numberOEM number confirmed per order; internal ref. UC-UNI-TS
FitmentConfirm by pitch and width
Weight900 kg
PackingExport pallet with wrapping and strapping
Warranty6 months

Shipping to your market

DestinationModeTransitIndicative
Tashkent, UZ / ТашкентRail + truck15–25 daysfrom $2.9/kg
Almaty, KZ / АлматыRail + truck12–22 daysfrom $2.6/kg
Lagos, NG / ЛагосSea LCL32–45 daysfrom $95/CBM
Nairobi, KE / НайробиSea LCL28–38 daysfrom $110/CBM
Rotterdam, NL / РоттердамSea LCL30–40 daysfrom $85/CBM

Freight is volatile — final cost confirmed at booking. We can ship consolidated with other parts to cut cost.

FAQ

How do I confirm this fits my machine?

Send the machine model, serial number and a photo of the identification plate. We check the OEM cross-reference and confirm before you pay.

What is included in the warranty?

6 months against manufacturing defects. Consumables, damage from contaminated oil and labour are excluded. We ship replacement parts, not cash refunds.

How do I pay?

30–50% deposit by T/T, balance before dispatch. For first orders we accept 100% advance or a documentary collection through your bank.

How is it shipped?

LCL or full container from Guangzhou. Rail/truck to Central Asia in 15–25 days, sea to Africa in 28–45 days. We quote FOB, CIF or DDP.

Get a price for this part

Send the machine model and quantity. You get a quote with shipping cost to your city within 24 hours.

Your inquiry goes straight to our inbox - we reply within 24 hours (usually much faster on WhatsApp or Telegram).

Related parts

Part Finder Get a Quote WhatsApp
WhatsApp Get a Quote