Photo on request - we photograph this unit (or the exact equivalent) before shipment.
Hydraulic Breaker 40t class (SB151 / 1900)
Hydraulic Breaker 40t class (SB151 / 1900). Sourced as new aftermarket replacement. Impact test and chisel check before dispatch. Handled as a project line - we confirm the machine serial, the original part number and the shipping method before quoting.
- MOQ
- 1
- Lead time
- 25-40 days
- Warranty
- 6 months
- Weight
- 2400 kg
Quality: New, aftermarket replacement
Fits these machines
| Brand | Model | Note |
|---|---|---|
| Universal | SB151 | Verify serial range |
| Universal | 1900 | Verify serial range |
Specifications
| Type | Hydraulic Breaker |
|---|---|
| Fits | SB151, 1900 |
| Condition | New, aftermarket replacement |
| Reference number | OEM number confirmed per order; internal ref. AT-UNI-SB151 |
| Testing | Impact test and chisel check |
| Target markets | Africa (Nigeria / Kenya / Ghana / Tanzania / South Africa) |
| Packing | Wooden crate, sea freight (LCL/FCL) consolidated |
| Weight | 2400 kg |
| Packing | Wooden crate, sea freight (LCL/FCL) consolidated |
| Warranty | 6 months |
Shipping to your market
| Destination | Mode | Transit | Indicative |
|---|---|---|---|
| Tashkent, UZ / Ташкент | Rail + truck | 15–25 days | from $2.9/kg |
| Almaty, KZ / Алматы | Rail + truck | 12–22 days | from $2.6/kg |
| Lagos, NG / Лагос | Sea LCL | 32–45 days | from $95/CBM |
| Nairobi, KE / Найроби | Sea LCL | 28–38 days | from $110/CBM |
| Rotterdam, NL / Роттердам | Sea LCL | 30–40 days | from $85/CBM |
Freight is volatile — final cost confirmed at booking. We can ship consolidated with other parts to cut cost.
FAQ
How do I confirm this fits my machine?
Send the machine model, serial number and a photo of the identification plate. We check the OEM cross-reference and confirm before you pay.
What is included in the warranty?
6 months against manufacturing defects. Consumables, damage from contaminated oil and labour are excluded. We ship replacement parts, not cash refunds.
How do I pay?
30–50% deposit by T/T, balance before dispatch. For first orders we accept 100% advance or a documentary collection through your bank.
How is it shipped?
LCL or full container from Guangzhou. Rail/truck to Central Asia in 15–25 days, sea to Africa in 28–45 days. We quote FOB, CIF or DDP.
Related parts
Attachments & Couplers